Skip to main content

Editor module

The editor module provides the ability to add front-end custom WIKI page node types, after adding editor-service, the plugin can implement the corresponding front-end editor component through this module.

The editor module provides several sub-modules by scene, as follows:

Slots​

ones:wiki:editor:new​

**Module path: ** ONES Wiki / Spaces / page

**Number limit: ** Declare a maximum of 10 slots in each plugin, and up to 10 slots in the system

Available Hook API​

Configuration​

Supported config options​

  • title(required)

    The page node type name.

  • icon(required)

    The page node type icon.

  • templateThumbnail

    The template thumbnails in the template management page use ONES-supplied thumbnails by default.

  • modules(required)

  • modules[*].title

    When type is "export"|"operation", this option is required to display the name of the operation button.

    This option is required to display the name of the import button when the type is "import" and there are two or more.

  • modules[*].scene(required)

    • type: "edit"|"view"|"history"|"import"|"export"|"operation"

      The type of the current slot (where "edit"|"view" submodules are required, and "import"|"export"|"operation" supports adding more than one).

  • modules[*].description

    When type is "import", this option is recommended for displaying the description of the import button on the work item association Wiki page.

  • modules[*].icon

    Operation type module (scene: "import"|"export"|"operation"), with support for setting button icons.

  • modules[*].manual

    Operation type module (scene: "import"|"export"|"operation"), this option must be set to true.

  • modules[*].preload

    Operation type module (scene: "import"|"export"|"operation"), this option is recommended to be set to true.

Example​

modules:
- id: ones-wiki-editor-new-f2OA
title: ONES Table
icon: logo.svg
templateThumbnail: template-thumbnail.png
moduleType: ones:wiki:editor:new
modules:
- id: ones-wiki-editor-new-XVKJ
title: edit
scene: edit
enableMemoryRouter: true
entry: modules/ones-wiki-editor-new-f2OA/ones-wiki-editor-new-XVKJ/index.html
- id: ones-wiki-editor-new-l8bc
title: view
scene: view
enableMemoryRouter: true
entry: modules/ones-wiki-editor-new-f2OA/ones-wiki-editor-new-l8bc/index.html
- id: ones-wiki-editor-new-qb2c
title: history
scene: history
enableMemoryRouter: true
entry: modules/ones-wiki-editor-new-f2OA/ones-wiki-editor-new-qb2c/index.html
- id: ones-wiki-editor-new-GnId
title: Import
scene: import
icon: logo.svg
enableMemoryRouter: true
preload: true
manual: true
entry: modules/ones-wiki-editor-new-f2OA/ones-wiki-editor-new-GnId/index.html
- id: ones-wiki-editor-new-DRUh
title: Export
scene: export
icon: logo.svg
enableMemoryRouter: true
preload: true
manual: true
entry: modules/ones-wiki-editor-new-f2OA/ones-wiki-editor-new-DRUh/index.html
- id: ones-wiki-editor-new-4FW8
title: Custom A
scene: operation
enableMemoryRouter: true
preload: true
manual: true
entry: modules/ones-wiki-editor-new-f2OA/ones-wiki-editor-new-4FW8/index.html
- id: ones-wiki-editor-new-gZ_W
title: Custom B
scene: operation
enableMemoryRouter: true
preload: true
manual: true
entry: modules/ones-wiki-editor-new-f2OA/ones-wiki-editor-new-gZ_W/index.html

Usage​

Step 1: Add module​

In the plugin root directory, execute npx op add module to search and add a module (ones:wiki:editor:new).

Adding submodules​

In the plugin root directory, execute npx op add sub-module, search and select the parent module ID generated in the previous step, and add the corresponding scene sub-module, which will be continued in the following example with the more complex scene: edit.

caution
  • edit, view are required submodules.

  • import, export, operation are manual trigger modules, you need to add manual: true when configuring them.

Step 2: Getting data via Hooks​

Install the @ones-op/store package in the /web directory, from which you can get the context information delivered by ONES.

You can use useCustomEditorInfo to get the current context of the editor (current page location, demo mode or not, publish method, cancel method), and then combine it with useWikiSpaceInfo, useWikiPageInfo, useTemplateInfo, etc. to get the current page information. hooks to get information about the current page.

Step 3: Discover Services​

The platform provides a discovery service interface, according to which the plugin can query the access address of the editor service.

After installing the @ones-op/fetch package in the /web directory, you can use the OPFetch method to request the discovery service interface.

interface WebServiceInfo {
data: {
app_id: string
root_route: string
http_url: string
ws_url: string
}[]
}

function fetchServiceInfo(appID: string) {
return OPFetch<WebServiceInfo>('api/project/plugin/web_service/info', {
// Override OPFetch's Ones-Plugin-Id plugin preset to make it request the Open Platform service
headers: { 'Ones-Plugin-Id': 'built_in_apis' },
method: 'post',
data: { app_id: appID },
})
}

function Editor() {
const { appID } = usePluginInfo()
const [wsBaseUrl, setWsBaseUrl] = useState()
useEffect(() => {
if (appID) {
fetchServiceInfo(appID).then((response) => {
setWsBaseUrl(response.data.data[0].ws_url)
})
}
}, [appID])

// ...
}

Step 4: Use WebSocket to realize online editing​

After getting the WebSocket base URL, the plugin can connect according to the editor service business logic to realize online collaborative editing.

// ...

function Editor() {
const { appID } = usePluginInfo()
const [wsBaseUrl, setWsBaseUrl] = useState()
const [ws, setWs] = useState()

useEffect(() => {
if (appID) {
fetchServiceInfo(appID).then((response) => {
setWsBaseUrl(response.data.data[0].ws_url)
})
}
}, [appID])

useEffect(() => {
if (wsBaseUrl) {
const ws = new WebSocket(`${wsBaseUrl}/my-path`)
ws.addEventListener('open', handleOpen)
ws.addEventListener('message', handleMessage)
ws.addEventListener('error', handleError)
ws.addEventListener('close', handleClose)
setWs(ws)
}
}, [wsBaseUrl])

// ...
}

Step 5: Publish the document​

Use useCustomEditorInfo to get the publish and cancel methods, which will automatically call the corresponding interfaces according to the current scenario to complete the publishing (e.g., in the case of a template scenario, the template will be published instead of the page).

function Editor() {
// ...
const { cancel, publish } = useCustomEditorInfo()

return (
// ...
<Button onClick={cancel}>Cancel</Button>
<Button onClick={publish}>Publish</Button>
// ...
)
}