获取测试用例库详细信息
GET/testcase/libraries/:libraryID
获取测试用例库详细信息
History
Version | Changes |
---|---|
v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |
Request
Path Parameters
libraryID stringrequired
测试用例库ID
Query Parameters
teamID stringrequired
团队ID
Responses
- 200
- 401
- 403
- 404
- 500
请求成功
- application/json
- Schema
- Example (from schema)
Schema
data
object
name string
测试用例库名称
id string
测试用例库ID
createTime integer
测试用例库创建时间
updateTime integer
测试用例库更新时间
stickToTop boolean
测试用例库是否置顶
testcaseFieldConfig
object
测试用例库字段配置信息
name string
测试用例库字段配置名称
id string
测试用例库配置ID
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
errorData object
本次请求错误元数据
[
{
"result": "SUCCESS",
"data": {
"name": "Testcase Library",
"id": "safia765",
"createTime": 1616592000,
"updateTime": 1616592000,
"stickToTop": false,
"caseFieldConfigurationID": "safia765"
}
},
{
"result": "FAIL",
"errorCode": "NotFound",
"errorMsg": "NotFound TestCaseLibrary"
}
]