新建测试用例库
POST/testcase/libraries
新建测试用例库
History
| Version | Changes |
|---|---|
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |
Request
Query Parameters
teamID stringrequired
团队ID
- application/json
Body
required
要新建的测试用例库信息
caseFieldConfigurationID string
Possible values: non-empty and <= 8 characters
测试用例库字段配置ID
name string
Possible values: non-empty and <= 32 characters
测试用例库名称
Responses
- 200
- 401
- 403
- 404
- 500
请求成功
- application/json
- Schema
- Example (from schema)
Schema
data
object
name string
测试用例库名称
id string
测试用例库ID
createTime integer
测试用例库创建时间
updateTime integer
测试用例库更新时间
stickToTop boolean
测试用例库是否置顶
caseFieldConfigurationID string
测试用例库字段配置ID
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
errorData object
本次请求错误元数据
[
{
"result": "SUCCESS",
"data": {
"name": "Testcase Library",
"id": "safia765",
"createTime": 1616592000,
"updateTime": 1616592000,
"stickToTop": false,
"caseFieldConfigurationID": "safia765"
}
},
{
"result": "FAIL",
"errorCode": "PermissionDenied",
"errorMsg": "PermissionDenied manage_library"
},
{
"result": "FAIL",
"errorCode": "NotFound",
"errorMsg": "NotFound caseFieldConfigurationID"
},
{
"result": "FAIL",
"errorCode": "InvalidParameter",
"errorMsg": "InvalidParameter TestCaseLibrary Library Empty"
},
{
"result": "FAIL",
"errorCode": "InvalidParameter",
"errorMsg": "InvalidParameter TestCaseLibrary Name TooLong"
},
{
"result": "FAIL",
"errorCode": "InvalidParameter",
"errorMsg": "InvalidParameter TestCaseLibrary caseFieldConfigurationID InvalidFormat"
}
]
如果身份验证凭据不正确或丢失,则返回
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "Unauthorized",
"errorMsg": "Access token is invalid"
}
如果scope检验不通过,则返回
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "Forbidden",
"errorMsg": "Scope is invalid"
}
如果未找到资源对象,则返回
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "NotFound",
"errorMsg": "Not Found"
}
内部服务器错误
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "Internal Server Error",
"errorMsg": "Internal Server Error"
}
Loading...