Product
danger
ONES API 已废弃。请使用Open API。
- schema
- api
说明:在产品管理中新建工作项请参考创建工作项文档,通过 product_uuids 关联相应产品即可。
schema
product
| aliases | type | required | canUpdate | description |
|---|---|---|---|---|
| uuid | text | F | F | [UUID] |
| item_type | text | T | F | [Item 类型] |
| key | text | F | F | [Item Key] |
| name | text | T | F | 所属产品名称 |
| name_pinyin | text | F | F | [名称拼音] |
| create_time | time | F | F | 创建时间 |
| owner | user | F | F | 产品创建人 |
| assign | user | T | F | 产品负责人 |
| task_count | integer | F | F | [工作项数] |
| task_count_to_do | integer | F | F | [未开始工作项数] |
| task_count_in_progress | integer | F | F | [进行中工作项数] |
| task_count_done | integer | F | F | [已完成工作项数] |
| product_components | product_component | F | F | [产品下组件] |
product_module
| aliases | type | required | canUpdate | description |
|---|---|---|---|---|
| uuid | text | F | F | [UUID] |
| item_type | text | T | F | [Item 类型] |
| key | text | F | F | [Item Key] |
| name | text | T | F | 所属功能模块名称 |
| name_pinyin | text | F | F | [名称拼音] |
| create_time | time | F | F | 创建时间 |
| update_time | time | F | F | 更新时间 |
| product | product | T | F | [产品] |
| position | integer | F | F | [位置] |
| path | text | F | F | [路径] |
| parent | product_module | F | F | [父模块] |
| task_count | integer | F | F | [工作项数] |
| task_count_include_children | integer | F | F | [工作项数以子模块的任务数] |
| with_children | text | F | F | [所属功能模块及子模块] |
product_components
| aliases | type | required | canUpdate | description |
|---|---|---|---|---|
| uuid | text | F | F | [UUID] |
| item_type | text | T | F | [Item 类型] |
| key | text | F | F | [Item Key] |
| create_time | time | F | F | 创建时间 |
| product | product | T | F | [产品] |
| position | integer | F | F | 位置 |
| context_type | integer | T | F | [上下文类型] |
| context_param_1 | text | T | F | [上下文参数 1] |
| context_param_2 | text | F | F | [上下文参数 2] |
| template_uuid | text | F | F | [组件模版 uuid] |
| parent | product_component | F | F | [父节点] |
| name | text | T | F | 产品组件名称 |
| name_pinyin | text | F | F | [名称拼音] |
| description | text | F | F | [组件描述] |
| type | integer | F | F | [组件类型] |
| settings | text | F | F | [组件功能设置] |
| kanban_setting | text | F | F | [组件功能看板设置] |
| url_setting | url_setting | F | F | [组件功能自定义链接设置] |
| views | product_component_view | F | F | [组件视图] |
| view_configs | product_component_view_config | F | F | [组件视图配置] |
product_component_view
| aliases | type | required | canUpdate | description |
|---|---|---|---|---|
| uuid | text | F | F | [UUID] |
| item_type | text | T | F | [Item 类型] |
| key | text | F | F | [Item Key] |
| product | product | T | F | [产品] |
| owner | user | F | F | [所有者] |
| product_component | product_component | F | F | [产品组件] |
| name | text | T | F | 产品组件视图名称 |
| layout | enum | F | F | [布局方式] |
| query | text | F | F | [筛选方式] |
| condition | text | F | F | [筛选条件] |
| sort | text | F | F | [排序方式] |
| group_by | text | F | F | [分组方式] |
| create_time | time | F | F | 创建时间 |
| built_in | boolean | F | F | [是否默认视图] |
| include_subtasks | boolean | F | F | [是否包含子任务] |
| table_field_settings | text | F | F | [表格模式的表头] |
| board_settings | text | F | F | [看板视图设置] |
| is_fold_all_groups | boolean | F | F | [是否折叠分组] |
| display_type | enum | F | F | [展示方式] |
| is_show_derive | boolean | F | F | [是否显示派生] |
product_component_view_config
| aliases | type | required | canUpdate | description |
|---|---|---|---|---|
| uuid | text | F | F | [UUID] |
| item_type | text | T | F | [Item 类型] |
| key | text | F | F | [Item Key] |
| component_uuid | product_component | T | F | [组件] |
| owner | user | F | F | [所有者] |
| view | product_component_view | T | F | [视图] |
| type | integer | T | F | [类型] |
| position | integer | T | F | [位置] |
| is_show | boolean | T | F | [是否隐藏] |
查询产品详细信息
{
products(orderBy: { createTime: "DESC" }) {
name
uuid
key
owner {
uuid
name
}
createTime
assign {
uuid
name
}
productComponents {
uuid
name
parent {
uuid
}
key
type
contextType
contextParam1
contextParam2
position
templateUUID
urlSetting {
url
}
views {
key
uuid
name
builtIn
}
}
taskCount
taskCountToDo
taskCountDone
taskCountInProgress
}
}
调用示例
{
"query": "{\n\tproducts(orderBy: { createTime: \"DESC\" }) {\n\t\tname\n\t\tuuid\n\t\tkey\n\t\towner {\n\t\t\tuuid\n\t\t\tname\n\t\t}\n\t\tcreateTime\n\t\tassign {\n\t\t\tuuid\n\t\t\tname\n\t\t}\n\t\tproductComponents {\n\t\t\tuuid\n\t\t\tname\n\t\t\tparent {\n\t\t\t\tuuid\n\t\t\t}\n\t\t\tkey\n\t\t\ttype\n\t\t\tcontextType\n\t\t\tcontextParam1\n\t\t\tcontextParam2\n\t\t\tposition\n\t\t\ttemplateUUID\n\t\t\turlSetting {\n\t\t\t\turl\n\t\t\t}\n\t\t\tviews {\n\t\t\t\tkey\n\t\t\t\tuuid\n\t\t\t\tname\n\t\t\t\tbuiltIn\n\t\t\t}\n\t\t}\n\t\ttaskCount\n\t\ttaskCountToDo\n\t\ttaskCountDone\n\t\ttaskCountInProgress\n\t}\n}\n",
"variables": {}
}
新建产品
请求体参考
{
"item": {
"assign": "6ZpgEzkk",
"name": "create_product",
"item_type": "product"
}
}
返回值参考
{
"item": {
"assign": "6ZpgEzkk",
"create_time": 1595299946,
"item_type": "product",
"key": "product-6ZpgEzkkQ7PkhGTv",
"name": "create_product",
"name_pinyin": "create_product",
"owner": "6ZpgEzkk",
"uuid": "6ZpgEzkkQ7PkhGTv"
}
}
更新产品
请求体参考
{
"item": {
"assign": "6ZpgEzkk",
"name": "壮师傅"
}
}
返回值参考
{
"item": {
"assign": "6ZpgEzkk",
"create_time": 1581999122,
"item_type": "product",
"key": "product-6ZpgEzkkUVfH1vUy",
"name": "壮师傅",
"name_pinyin": "zhuang4shi1fu4",
"owner": "6ZpgEzkk",
"uuid": "6ZpgEzkkUVfH1vUy"
}
}
删除产品
返回值参考
{
"code": 200,
"errcode": "OK",
"type": "OK"
}
查询产品下模块列表
{
buckets(
groupBy: { productModules: { product: {} } }
filter: { product: { uuid_in: ["6ZpgEzkkQ7PkhGTv"] } }
) {
key
product {
uuid
name
}
productModules {
key
name
uuid
position
path
updateTime
parent {
uuid
name
}
}
}
}
调用示例
{
"query": "{\n\tbuckets(\n\t\tgroupBy: { productModules: { product: {} } }\n\t\tfilter: { product: { uuid_in: [\"6ZpgEzkkQ7PkhGTv\"] } }\n\t) {\n\t\tkey\n\t\tproduct {\n\t\t\tuuid\n\t\t\tname\n\t\t}\n\t\tproductModules {\n\t\t\tkey\n\t\t\tname\n\t\t\tuuid\n\t\t\tposition\n\t\t\tpath\n\t\t\tupdateTime\n\t\t\tparent {\n\t\t\t\tuuid\n\t\t\t\tname\n\t\t\t}\n\t\t}\n\t}\n}\n",
"variables": {}
}
新建模块
请求体参考
{
"item": {
"name": "module1",
"parent": null,
"item_type": "product_module",
"product": "6ZpgEzkkQ7PkhGTv"
}
}
返回值参考
{
"item": {
"create_time": 1595305580,
"item_type": "product_module",
"key": "product_module-YUczuVEL",
"name": "module1",
"name_pinyin": "module1",
"parent": "",
"path": "YUczuVEL",
"position": 0,
"product_uuid": "6ZpgEzkkQ7PkhGTv",
"update_time": 1595305580,
"uuid": "YUczuVEL"
}
}
新 建子模块
请求体参考
{
"item": {
"name": "submodule1",
"parent": "YUczuVEL",
"item_type": "product_module",
"product": "6ZpgEzkkQ7PkhGTv"
}
}
返回值参考
{
"item": {
"create_time": 1595305880,
"item_type": "product_module",
"key": "product_module-NrBGJ6KK",
"name": "submodule1",
"name_pinyin": "submodule1",
"parent": "YUczuVEL",
"path": "YUczuVEL-NrBGJ6KK",
"position": 1,
"product_uuid": "6ZpgEzkkQ7PkhGTv",
"update_time": 1595305880,
"uuid": "NrBGJ6KK"
}
}
更新模块
请求体参考
{
"item": {
"name": "updatemodule1name"
}
}
返回值参考
{
"item": {
"create_time": 1595305580,
"item_type": "product_module",
"key": "product_module-YUczuVEL",
"name": "updatemodule1name",
"name_pinyin": "updatemodule1name",
"parent": "",
"path": "YUczuVEL",
"position": 0,
"product_uuid": "6ZpgEzkkQ7PkhGTv",
"update_time": 1595311936,
"uuid": "YUczuVEL"
}
}
删除模块
返回值参考
{
"code": 200,
"errcode": "OK",
"type": "OK"
}