Filters
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.10.26+ |
Overview
Append a new module to the left of the top header action zone under the path "My work" - "Filters"
The slots currently supported are as follows:
Slots
ones:workspace:filter:header:action:new
Module path: My work / Filters / top header action / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
Usage
modules:
- id: ones-workspace-filter-header-action-new-Nc4T
title: new header action
moduleType: ones:workspace:filter:header:action:new
entry: modules/ones-workspace-filter-header-action-new-Nc4T/index.html
Available Hook API
import { useFilterInfo } from '@ones-op/store'
const filterInfo = useFilterInfo()