Skip to main content

Login

Suitable EnviromentPrivate Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Login" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:login​

ONES Requirement: v3.6.25+

Module path: Replace the login page.

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:join:team​

ONES Requirement: v3.6.25+

Module path: Replace the join team login page.

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:login:ldap​

ONES Requirement: v3.15.7+

Module path: Replace the ldap login page.

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:login:connect​

Module path: Add a new entrance in the third-party login module.

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-login-connect-RCp-
title: login
moduleType: ones:login:connect
entry: modules/ones-login-connect-RCp-/index.html