Login
| Suitable Enviroment | Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Login" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:login
ONES Requirement: v3.6.25+
Module path: Replace the login page.
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:join:team
ONES Requirement: v3.6.25+
Module path: Replace the join team login page.
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:login:ldap
ONES Requirement: v3.15.7+
Module path: Replace the ldap login page.
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:login:connect
Module path: Add a new entrance in the third-party login module.
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-login-connect-RCp-
title: login
moduleType: ones:login:connect
entry: modules/ones-login-connect-RCp-/index.html