执行工作项的工作流
POST/project/issues/:issueID
执行工作项的工作流
History
| Version | Changes |
|---|---|
| v3.14.117, v3.15.26 | Added in: v3.14.117, v3.15.26 |
Request
Path Parameters
issueID stringrequired
工作项ID
Query Parameters
- action: 执行工作项工作流,支持
executeWorkflow.
teamID stringrequired
团队ID
action stringrequired
- application/json
Body
required
要更新的工作流信息
Array [
]
Array [
]
Array [
]
Array [
]
id stringrequired
Possible values: non-empty and <= 8 characters
工作流ID
fieldValues
object[]
工作项属性信息
fieldID stringrequired
Possible values: >= 8 characters
工作项属性ID
type integerrequired
Possible values: >= 1
工作项属性类型
value objectrequired
工作项属性值
resources
object[]
要关联的附件ID,以逗号,隔开
id string
comment
object[]
工作项评论
contentType integerrequired
Possible values: >= 1
工作项评论类型
text stringrequired
工作项评论的信息
timeEstimatedHour
object
工作项预估时间
hours integer
timeSpentHour
object[]
工作项已登记工时
owner stringrequired
登记工时的负责人
startTime integerrequired
登记工时的开始时间
hours integerrequired
登记几个小时,单位(h)
description string
登记工时的描述
Responses
- 200
- 401
- 403
- 404
- 500
请求成功
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
errorData object
本次请求错误元数据
[
{
"result": "SUCCESS"
},
{
"result": "FAIL",
"errorCode": "NotFound",
"errorMsg": "NotFound issue"
},
{
"result": "FAIL",
"errorCode": "NotFound",
"errorMsg": "NotFound parentissue"
},
{
"result": "FAIL",
"errorCode": "MissingParameter",
"errorMsg": "MissingParameter workflow manhour"
},
{
"result": "FAIL",
"errorCode": "MissingParameter",
"errorMsg": "MissingParameter workflow attachment"
},
{
"result": "FAIL",
"errorCode": "MissingParameter",
"errorMsg": "MissingParameter workflow comment"
},
{
"result": "FAIL",
"errorCode": "MissingParameter",
"errorMsg": "MissingParameter workflow relatedwikiPage"
},
{
"result": "FAIL",
"errorCode": "MissingParameter",
"errorMsg": "MissingParameter workflow assign"
},
{
"result": "FAIL",
"errorCode": "MissingParameter",
"errorMsg": "MissingParameter workflow fieldvalue"
},
{
"result": "FAIL",
"errorCode": "MissingParameter",
"errorMsg": "MissingParameter workflow fieldValue"
}
]
如果身份验证凭据不正确或丢失,则返回
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "Unauthorized",
"errorMsg": "Access token is invalid"
}
如果scope检验不通过,则返回
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "Forbidden",
"errorMsg": "Scope is invalid"
}
如果未找到资源对象,则返回
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "NotFound",
"errorMsg": "Not Found"
}
内部服务器错误
- application/json
- Schema
- Example (from schema)
Schema
result string
本次请求结果,SUCCESS|FAIL
errorCode string
本次请求错误码
errorMsg string
本次请求错误信息
{
"result": "FAIL",
"errorCode": "Internal Server Error",
"errorMsg": "Internal Server Error"
}
Loading...