Simple macro
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.11.30+ |
Overview
We have provided slots for "ONES Wiki" - "Spaces" - "select a space" - "Wiki collaborative page" to customize the page module for the application.
There are two ways to insert the plugin into document: In the editable page, click the menu on the left or type the shortcut. You can config it in the plugin.yaml.
The slots currently supported are as follows:
Slots
ones:wiki:editor:embed
Module path: ONES Wiki / Spaces / select a space / Wiki collaborative page / block element
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
Usage
modules:
- id: ones-wiki-editor-embed-Pl6y
title: issue
moduleType: ones:wiki:editor:embed
macroShortcut: issue
description: Insert the issue
# Icon of macro
icon: macro-icon.svg
modules:
- id: ones-wiki-editor-embed-syM2
title: show
# Scene of slot,
# `render` used to render the display interface
# `toolbar` used to render the editable interface
scene: render
entry: modules/ones-wiki-editor-embed-Pl6y/ones-wiki-editor-embed-syM2/index.html
- id: ones-wiki-editor-embed-BUmK
# The title and icon will render when the user hovers over the block element of macro
title: edit
icon: edit.svg # Required
scene: toolbar
preload: true # Required
manual: true # Required
entry: modules/ones-wiki-editor-embed-Pl6y/ones-wiki-editor-embed-BUmK/index.html
Supported config options:
-
macroShortcut
-
type:
stringShortcut for the plugin
For example:
macroShortcut: issue, when the user is editing the document, the user can insert the plugin into the current document by just typing/issue.
-
-
enableCollaborative
-
ONES Requirement:
v3.13.36+ -
type:
booleanEnable multiple users to edit the same document data at the same time. By default, the other users can't edit the block when one user clicks the toolbar.
-
-
modules[*].scene(required)
-
type:
"toolbar"|"render"Scene of the plugin,
renderused to render the display interfacetoolbarused to render the editable interfaceA macro plugin consists of two parts:
- Display Interface(
scene: render), Required, used to render the data in the wiki. When one user is editing the element, this element for another user will be disabled.
cautionThe element used to accept data from the user(e.g.
<input>) cannot be used in the block element(which intercept lots of DOM event, so the edit element cannot respond to the input from the user). These editing operations must be placed in the editable interface which triggers by thetoolbar.- Editable interface(
scene: toolbar), Required, Triggered by the toolbar. Each time it is opened, the editable interface will be reinitialized, and when it is closed, the instance of the editable interface will be destroyed.
- Display Interface(
-
-
If
modules[*].scene === 'toolbar', This is used to render the icon of thetoolbar. -
This option must be set to
trueifmodules[*].scene === 'toolbar'. -
This option is recommended to be set to
trueifmodules[*].scene === 'toolbar'.
Available Hook API
import { useDocumentInfo } from '@ones-op/store'
const documentInfo = useDocumentInfo()
Open The editable interface Actively
In most cases, the editable interface is opened when the user clicks the button in the toolbar. If wants to open it automatically when the user inserts the macro into the wiki document
for the first time, The parameter isTriggerByUser is useful to implement this with the help of a local variable.
Display interface
let shouldOpenEditPage = true
function App() {
const document = useDocumentInfo<unknown, boolean>()
useEffect(() => {
if (document.isTriggerByUser && shouldOpenEditPage) {
// Go to editable interface
document.goToState({
builtIn: false,
value: {
id: 'ones-wiki-editor-embed-BUmK',
title: 'edit',
},
customData: true,
})
shouldOpenEditPage = false
}
}, [document])
return <div />
}
Editable interface
- Latest
- ONES v3.11.40-
import { lifecycle } from '@ones-op/bridge'
function App() {
const document = useDocumentInfo<unknown, boolean>()
const cancel = useCallback(() => {
if (document.toolbarState.customData) {
document.destroy()
} else {
// close toolbar
lifecycle.destroy()
}
}, [document])
return <Modal title="Plugin development" onCancel={cancel} />
}
function App() {
const document = useDocumentInfo<unknown, boolean>()
const cancel = useCallback(() => {
if (document.toolbarState.customData) {
document.destroy()
} else {
// close toolbar
document.goToState({
builtIn: true,
value: 'init',
})
}
}, [document])
return <Modal title="Plugin development" onCancel={cancel} />
}
Save The Data
When invoking the function saveData, the data will be saved to the wiki document. If the data is simple(e.g. URL, text, etc.), it's OK to save it to the document.
But if the data is large, recommended saving the data in the backend database by communicating with backend services, and then save the returned ID in the document.
The data in the document will be used to revoke, version rollback, etc. Every time the user performs those operations, the editor will return the corresponding version of the data to the plugin for rendering.
While saving the data, the plugin needs to tell the editor how to export this data when the user export it to word or PDF(for example, the issue plugin will
save the ID into the document. When exported to PDF, this data will render as a link). Now only three formats are supported(text, link, image). This has been defined
in the API section. Among them, the image is special, you need to save the image to the background server of the editor by calling the uploadResource method,
and the server will return the file name of the resource. Finally, use the returned file name to generate an export format, refer to the following example.
When uploading the resource to the editor service by using uploadResource, the resource is bound to the document. If the user needs to copy the macro to a new document,
the resource in the previous document is need to bind to the current document too. So there is a fixed field resources in the data, if the resources exists,
the platform will bind the resources to the new document.
The resources in the exportSpec do not need to add to the fixed field resources, the platform handles it by default.
Do not pass a custom value to the field resources, otherwise it will be treated as a resource ID.
document.saveData(
{
resources: [resourceId],
},
{
exportSpec: [
{
type: 'image',
data: resourceName,
},
],
},
)
- Latest
- ONES v3.11.40-
import { lifecycle } from '@ones-op/bridge'
const document = useDocumentInfo()
document
.uploadResource(File /** the image file that needs to be exported */, 'test.svg'), () => {})
.then((resourceName) => {
document.saveData(
// the data that saves to the document
{
data: value,
// Do not pass a custom value to the field `resources`, otherwise it will be treated as a resource ID.
resources: [resourceId]
},
{
exportSpec: [
{
type: 'image',
data: resourceName,
},
],
}
)
// close toolbar
lifecycle.destroy()
})
const document = useDocumentInfo()
document
.uploadResource(File /** the image file that needs to be exported */, 'test.svg'), () => {})
.then((resourceName) => {
document.saveData(
// the data that saves to the document
{
data: value,
// Do not pass a custom value to the field `resources`, otherwise it will be treated as a resource ID.
resources: [resourceId]
},
{
exportSpec: [
{
type: 'image',
data: resourceName,
},
],
}
)
// close toolbar
document.goToState({
builtIn: true,
value: 'init',
})
})
Plugin Runtime Status
The runtime status of the plugin can be get by the param status, and the plugin can modify the status by function setStatus,
for example, when the data in the document is not expected, the plugin needs to tell the user to edit the data by call function setStatus.
For the definition of specific states, please refer to the API type definition.
const document = useDocumentInfo()
document.setStatus(EmbedPluginRuntimeStatus.DATA_INVALID)